Soft Strip Demolition Services In Spalding

As a strip-out contractor, we make sure all of your specific needs are met through our soft strip demolition services. The first point of action during is to conduct an on-site assessment to identify any potential hazards prior to delivery. This will allow us to deliver a fully compliant and efficient service.

Partition Removal – Dismantling stud walls, glazed panels, and internal non-structural features
Floor Lifting – Taking up carpets, tiles, laminates, raised flooring, and similar systems
M&E Removal – Disconnecting lighting, electrical circuits, wiring, and mechanical systems
Lift & Escalator Dismantling – Removing lift shafts, escalators, and associated structures
Licensed Asbestos Disposal – Carried out by certified professionals in line with UK regulations
HVAC System Removal – Clearing ductwork, air units, extractor fans, and full ventilation systems

If you’re not sure we can help you, contact us and we’ll do what we can to tailor our strip-out services towards your property.

0800 058 2522

info@yeswaste.com

Name
Your Name
Field is required!
Field is required!
Email address
Your email address
Field is required!
Field is required!
Phone number
Your Phone Number
Field is required!
Field is required!
Company
Your Company Name
Field is required!
Field is required!
Postcode
Your Postcode
Field is required!
Field is required!
Summary
Please provide us with information about the project
Field is required!
Field is required!

How Our Soft Strip Demolition Process Works In Spalding

We prioritise the health and safety of everyone throughout every stage of your strip-out service. Our team begins by conducting an on-site Risk Assessment and Method Statement (RAMS). This is so we can make sure that we’re delivering a fully compliant demolition all the way through.

✔️ RAMS tailored to your property’s layout and access requirements
✔️ Professional teams managing each phase of the strip-out process
✔️ Safe handling of hazardous waste, including licensed asbestos removal
✔️ Dust and noise control measures to limit disruption
✔️ Flexible scheduling to suit occupied or operational environments
✔️ Waste disposal carried out in full compliance with UK regulations
✔️ Ongoing updates and clear communication at every stage
✔️ Full reporting and progress tracking from start to finish

Get in touch today to schedule your soft strip-out demolition in Spalding.

Book Your Strip-Out Demolition

Residential, Commercial & Industrial Strip Out Services

We carry out a wide range of soft strip demolition services, including:

Office Strip-Outs
✅ Building Demolition
✅ Industrial Strip-Out Demolitions
✅ Plant Room Clearances
✅ Residential Property Strip-Outs
✅ Commercial Building Strip-Outs

If you’re planning a soft strip demolition in Spalding, get in touch to arrange an on-site assessment.

Call us:

0800 058 2522

Email:

info@yeswaste.com

Or fill out our online enquiry form and we’ll get back to you.

See What Some Of Our Previous Customers Say About Our Strip-Out Services…

Quote header Quote footer
Yeswaste Icon

Commercial Case Study.

 

Office strip out

We were appointed by Dragonfly Contracts Ltd, a full service construction, to strip out and clear the resulting waste from an office block located in Manchester


Read More
Yeswaste Icon

Commercial Case Study.

 

Office strip-out Leeds

Responsible for stripping-out a 4th-floor office in Leeds with no lift access and ensuring all of the waste was tipped at fully licensed waste transfer stations within Leeds.


Read More
Yeswaste Icon

Commercial Case Study.

 

Office soft strip demolition Liverpool

Appointed as the contractor for a multi-phased soft strip demolition at an office in Liverpool, with all of the waste being tipped at fully licensed waste transfer stations.


Read More
Yeswaste Icon

Commercial Case Study.

 

Soft Strip Demolition in Crewe

Our biggest strip out project of 2023 was at JTI Crewe. We were well positioned to take on these works as although the job was big, it consisted of elements Yes Waste considers its bread and butter. Partitions, ceiling tiles and grids, carpet tiles, high level M&E and lots of each!


Read More
Yeswaste Icon

Commercial Case Study.

 

Warehouse soft strip demolition

Appointed as the soft strip demolition contractor at a warehouse unit in Ossett. We completed the works on time, to budget and approx 90% of waste collected diverted from landfill.


Read More

Frequently Asked Questions On Our Strip-Out Demolition Services In Spalding

We provide soft strip-out demolition services throughout Spalding, covering properties within the PE11 and PE12 postcode areas:

PE11 – Spalding, Pinchbeck, Surfleet, Weston, Deeping St Nicholas
PE12 – Holbeach, Long Sutton, Sutton Bridge, Moulton, Gedney

If your property falls outside these areas, we also offer nationwide coverage. Get in touch with our team to check availability in your location.

We calculate soft strip-out pricing based on your project’s specific needs. Each quote reflects the volume of material there is to be stripped out, the level of access to the property, and how long the demolition is expected to take.

We begin each strip-out demolition with a full on-site Risk Assessment and Method Statement (RAMS). This helps us identify any potential risks early and create a safety plan that’s fully aligned with your project’s specific needs.

We carry out soft strip-out demolitions throughout Spalding, working in both live and vacant environments across a wide variety of property types, including:

✔️ Office Spaces
✔️ Retail Shops and High Street Units
✔️ Restaurants, Cafés, and Takeaways
✔️ Warehouses and Industrial Sites
✔️ Schools, Colleges, and Universities
✔️ Hospitals, Health Clinics, and Surgeries
✔️ Gyms, Leisure Centres, and Sports Facilities
✔️ Hotels, Guesthouses, and B&Bs
✔️ Flats, Apartments, and Housing Complexes
✔️ Student Accommodation
✔️ Detached Homes and Private Residences
✔️ Community Halls and Town Centre Buildings
✔️ Government and Council-Owned Properties
✔️ Vacant or Dilapidated Buildings

Get in touch with our team today to arrange a site visit for your soft strip-out in Spalding.

The length of your strip-out demolition will depend on the property’s size and complexity. After we complete a full site assessment, we’ll provide a clear timeline and projected completion date to keep the process on track and well organised.

We frequently manage strip-out demolitions in properties with limited or awkward access. If your building includes tight stairwells, communal hallways, or lacks lift access, let us know early on. This allows us to prepare properly with the right tools and team to deliver the demolition efficiently and with minimal disruption.