Nantwich Strip Out & Soft Strip Demolition Contractor

We work with commercial, industrial and residential clients across Nantwich and surrounding areas including Willaston, Wybunbury and Acton. Just tell us what you need cleared and we’ll schedule your project. Our team provides full internal strip out services for shops, offices, warehouses, schools and residential properties. We clear spaces ready for new layouts, refits or end-of-lease handovers.

Our Nantwich Strip Out Contractor Covers:

✅ Partition Removal – Stud walls, glazed screens, timber partitions and modular panels stripped out and cleared
✅ Floor Finishes – Carpet tiles, vinyl, ceramic and porcelain tiles, timber floors and raised floors removed
✅ M&E Strip-Outs – Dismantling of lighting, sockets, internal cabling, radiators, control panels and data networks
HVAC Systems – Extraction systems, ductwork, ceiling grilles and mechanical ventilation units disconnected and taken away
Kitchens And Bathrooms – Removal of units, sinks, appliances, toilets, showers, tiles and plumbing pipework
Ceiling Grid Removal – Complete removal of suspended ceilings including grid systems, acoustic tiles and lighting supports
Fixtures And Fittings – Built-in shelving, display furniture, shop counters, office furniture, racking and signage cleared
Hazardous Waste – Fire extinguishers, battery packs, fluorescent lighting and other controlled materials collected and disposed of safely

If your project scope includes additional internal elements or specialist demolition waste, we’ll adjust the work plan accordingly.

 

 

Name
Your Name
Field is required!
Field is required!
Email address
Your email address
Field is required!
Field is required!
Phone number
Your Phone Number
Field is required!
Field is required!
Company
Your Company Name
Field is required!
Field is required!
Postcode
Your Postcode
Field is required!
Field is required!
Summary
Please provide us with information about the project
Field is required!
Field is required!

Professional Contractor For Commercial, Residential And Industrial Strip Outs

As an established soft strip contractor, we support commercial, residential and industrial projects of all sizes across Nantwich and surrounding areas. Before we begin, we produce a detailed scheme of work aligned with your project scope. Our team prepares site-specific Risk Assessments and Method Statements (RAMS) and manages demolition waste responsibly, ensuring compliance with all regulations.

✔️ Site-specific RAMS created for every project
✔️ Fully trained and qualified operatives
✔️ Safe removal of hazardous materials (including asbestos, if identified)
✔️ Noise, dust, and vibration controls implemented
✔️ Live environment work procedures available (e.g. out-of-hours work)
✔️ Waste managed and disposed of in line with environmental regulations
✔️ Regular site inspections and toolbox talks conducted
✔️ Clear communication with clients and site managers throughout

We will plan the project carefully and communicate clearly throughout to help you achieve your project goals on time.

Contact Us

Book Your Strip-Out Demolition In Nantwich

We deliver internal strip out contractor services across Nantwich and the wider Cheshire area. Our team clears properties of all types and sizes, managing demolition waste with care and providing all necessary documentation.

Licensed Strip-Out Contractor – Approved to remove and dispose of all waste types
Serves All Property Types – Offices, shops, clinics, salons, schools and public buildings
Fixed Pricing – Quotes based on layout, volume and access

Once we understand your project requirements, we’ll provide a clear quote and arrange the works to suit your timeline.

📞 Call us: 0800 058 2522

📧 Email us: info@yeswaste.com

Or fill out our online enquiry form and we’ll be in touch.

Yeswaste Icon

Commercial Case Study.

 

Warehouse and office strip Warrington

We were appointed by Workspace Ltd, a commercial property company, to strip out and clear the resulting waste from a warehouse and two office floors from a property located in Warrington.


Read More
Yeswaste Icon

Commercial Case Study.

 

Warehouse soft strip demolition

Appointed as the soft strip demolition contractor at a warehouse unit in Ossett. We completed the works on time, to budget and approx 90% of waste collected diverted from landfill.


Read More
Yeswaste Icon

Commercial Case Study.

 

Office strip out

We were appointed by Dragonfly Contracts Ltd, a full service construction, to strip out and clear the resulting waste from an office block located in Manchester


Read More
Quote header Quote footer

Frequently Asked Questions For Soft Strip Services In Nantwich

Yes. We provide strip out demolition across Nantwich and nearby parts of Cheshire. Each project is planned carefully to match your layout, access needs and demolition waste streams.

Areas And Postcodes We Cover Around Nantwich:

📍 CW5 – Nantwich, Willaston, Wybunbury, Acton

If your location is not listed, contact us and we’ll confirm availability.

Yes. We fully isolate and strip out internal wiring, lighting, sockets, radiators, ducting, plumbing pipework and associated mechanical systems.

We can. Our team is fully licensed to remove hazardous demolition waste such as fluorescent lighting, battery packs, emergency lighting and fire extinguishers.

Yes. All demolition waste we remove is fully documented with Waste Transfer Notes. Hazardous waste is recorded with the appropriate consignment notes to ensure full compliance.

It is. We deliver strip outs for end-of-lease dilapidations, helping landlords and tenants return properties to the correct condition under lease agreements.

We provide strip out demolition services across a wide range of property types in and around Nantwich:

✔️ Office Buildings
✔️ Retail Units and Shops
✔️ Restaurants and Cafes
✔️ Warehouses and Industrial Sites
✔️ Schools, Colleges and Universities
✔️ Hospitals and Medical Centres
✔️ Leisure Centres and Gyms
✔️ Hotels
✔️ Blocks of Flats
✔️ Student Accommodation
✔️ Houses and Bungalows
✔️ Community Centres
✔️ Civic Buildings and Town Halls
✔️ Dilapidated Buildings

We’ll tailor the works to your building’s layout and requirements.

Demolition waste is carefully separated on site and removed by licensed carriers. We sort general, recyclable and hazardous materials and provide full waste documentation to support compliance.

 

Yes. We prepare site-specific RAMS for every project. These documents detail the methods of work, waste handling procedures, risk mitigation and emergency planning required to deliver a safe and compliant strip out.