Soft Strip Demolition Services In Berwick upon Tweed
Prior to your soft strip demolition project, we’ll send a surveyor to conduct a site assessment of your property. We can use this to put together a tailored plan for your property, helping us meet all of your specific requirements throughout.
✅ Partition Removal – Dismantling stud walls, glazed sections, and other non-load-bearing internal features
✅ Floor Lifting – Stripping out carpet, vinyl, laminate, tiles, and raised flooring systems
✅ M&E Removal – Disconnecting and removing mechanical units, electrical systems, lighting, and cabling
✅ Lift & Escalator Dismantling – Taking apart lifts, escalators, and all supporting structural elements
✅ Licensed Asbestos Disposal – Managed by certified professionals in full compliance with UK safety regulations
✅ HVAC System Removal – Clearing ventilation ducting, extractor fans, and air handling equipment
If you need anything beyond the list above, get in touch and we’ll adapt our strip-out service to suit your project’s requirements.
0800 058 2522
info@yeswaste.com
How Our Soft Strip Demolition Process Works In Berwick upon Tweed
We make sure your health and safety is considered through every stage of your strip-out service. We’ll conduct a Risk Assessment and Method Statement (RAMS) to remain fully compliant under all UK regulations, while also allowing us to figure out the safest way possible to deliver your site clearance.
✔️ RAMS completed to reflect your property’s layout, structure, and any access limitations
✔️ Licensed operatives managing every stage from the initial strip-out to final clearance
✔️ Certified removal of hazardous waste, including asbestos, in full accordance with UK regulations
✔️ Dust and noise controlled using appropriate on-site mitigation systems
✔️ Scheduling arranged to suit occupied or operational environments
✔️ All strip-out waste processed through fully licensed and compliant facilities
✔️ Clear communication and regular progress updates provided throughout the project
✔️ Full documentation issued from the first site survey to final project sign-off
Contact our team today to arrange your soft strip-out demolition service in Berwick upon Tweed.
Residential, Commercial & Industrial Strip Out Services
We handle all types of soft strip demolition services, tailored to suit a wide range of property types and project requirements. Our service includes:
✅ Office Strip-Outs
✅ Building Demolition
✅ Industrial Unit Strip-Outs
✅ Plant Room Dismantling
✅ Residential Property Strip-Outs
✅ Commercial Building Clearances
If you need a soft strip demolition or site clearance service in Berwick upon Tweed, contact our team today to arrange an on-site assessment.
Call us:
0800 058 2522
Email:
info@yeswaste.com
Or fill out our online enquiry form and we’ll get back to you.
See What Some Of Our Previous Customers Say About Our Strip-Out Services…
I have used Yes Waste for a number of years now, whether it's their general wait-and-load waste removal service or the full soft strip-out demolition team. They have always been quick, reliable, and completed the job on time. I would highly recommend their services.
Graeme, Berwick upon Tweed
I have worked with Yes Demolition on multiple occasions and have never had an issue that has not been resolved quickly and efficiently with the top quality customer service from the team. The operatives on site come well presented, ready to work and always put their full effort into what you are trying to achieve on a daily basis. The efficiency and professionalism from the company is second to none and I would recommend the team to all main contractors throughout the UK, looking for a quick and easy solution to their soft and hard strip out projects. It has been a pleasure to work with Yes Waste over the years we have operated with the company.
Ryan, Ashington
Workspace Design and Build have been using Yes Waste and Yes Demolition for years to complete both waste removals and strip outs since 2013. We have always been happy with their work, standards and efficiency and will continue to use their services for many years to come!
Elliot, Newcastle upon Tyne
Inco Contracts have used Yes Waste and Yes Demolition throughout 2024 for various Strip out and demolition projects including waste removal and will be continually using them throughout 2025 and beyond.
Nathan, Bedlington
Commercial Case Study.
Office strip out
We were appointed by Dragonfly Contracts Ltd, a full service construction, to strip out and clear the resulting waste from an office block located in Manchester
Read More
Commercial Case Study.
Office strip-out Leeds
Responsible for stripping-out a 4th-floor office in Leeds with no lift access and ensuring all of the waste was tipped at fully licensed waste transfer stations within Leeds.
Read More
Commercial Case Study.
Office soft strip demolition Liverpool
Appointed as the contractor for a multi-phased soft strip demolition at an office in Liverpool, with all of the waste being tipped at fully licensed waste transfer stations.
Read More
Commercial Case Study.
Soft Strip Demolition in Crewe
Our biggest strip out project of 2023 was at JTI Crewe. We were well positioned to take on these works as although the job was big, it consisted of elements Yes Waste considers its bread and butter. Partitions, ceiling tiles and grids, carpet tiles, high level M&E and lots of each!
Read More
Commercial Case Study.
Warehouse soft strip demolition
Appointed as the soft strip demolition contractor at a warehouse unit in Ossett. We completed the works on time, to budget and approx 90% of waste collected diverted from landfill.
Read More
Frequently Asked Questions On Our Strip-Out Demolition Services In Berwick upon Tweed
We carry out soft strip-out demolitions across Berwick upon Tweed and the surrounding TD15 postcode area, covering:
Foulden
Mordington
Lamberton
Paxton
Fishwick
Ladykirk
Norham
Ford
Cheswick
Holy Island
Hutton
Horncliffe
Duddo
Fenwick
Ancroft
Lowick
Scremerston
Spittal
Holburn
If your property is outside the TD15 postcode, we also provide nationwide coverage. Contact our team to check availability in your area.
Once we’ve carried out an initial assessment of your property, we’ll provide a fixed quote tailored to your project. Our pricing takes into account the volume of material we need to strip out, access conditions, and the time required to complete the service safely and in line with your schedule.
The first stage of your soft strip demolition involves a full property visit to complete a detailed Risk Assessment and Method Statement (RAMS). This helps us identify any hazards early and put the right safety measures in place, keeping the entire process fully compliant with UK regulations from start to finish.
We carry out soft strip-out demolitions across Berwick upon Tweed, working in both vacant and occupied properties across a wide range of sectors, including:
✔️ Office Spaces and Business Premises
✔️ Retail Units and High Street Stores
✔️ Restaurants, Takeaways, and Cafés
✔️ Warehouses and Light Industrial Sites
✔️ Schools, Colleges, and Educational Buildings
✔️ Hospitals, Clinics, and Medical Centres
✔️ Leisure Centres, Sports Halls, and Gyms
✔️ Hotels, Guesthouses, and B&Bs
✔️ Flats, Apartments, and Residential Blocks
✔️ Student Housing and Shared Accommodation
✔️ Detached Homes and Private Residences
✔️ Community Centres and Local Halls
✔️ Council and Public Authority Buildings
✔️ Vacant or Dilapidated Structures
Get in touch with our team today to arrange a property visit for your soft strip demolition in Berwick upon Tweed.
The time needed to complete your strip-out service will depend on the property’s size, layout, and condition. Following the initial assessment, we’ll develop a clear schedule with set timelines and a planned completion date to keep the project running smoothly from start to finish.
We often handle strip-out demolitions in buildings with limited or difficult access. If your property has narrow staircases, shared corridors, or no lift access, let us know in advance. This allows us to plan effectively and bring the right team and equipment to carry out the demolition safely and without disruption.